Brittleware Farm — Electrical Load Assessment for Residential Development
Horley, Surrey
Project Overview
XLR8 MEP Design Ltd was appointed by a residential developer to undertake a detailed electrical load calculation and demand assessment for an 8-unit new-build residential scheme at Brittleware Farm, Horley.
The purpose of the study was to define the required incoming electrical supply capacity and provide a clear technical basis for submission to the Distribution Network Operator (DNO).
Client Requirement
The client required a structured engineering assessment to:
- Determine electrical demand across all proposed dwellings
- Incorporate modern loads including heat pumps and EV charging
- Apply appropriate diversity across the development
- Establish a realistic maximum demand for the incoming supply application
Scope of Services
XLR8 MEP Design Ltd provided:
- Full electrical load calculations for all 8 dwellings
- Assessment of:
- Lighting and small power
- Heating and hot water systems
- EV charging demand
- cooking loads
- Inclusion of landlord electrical supplies (external lighting and spare capacity)
- Development of ADMD (After Diversity Maximum Demand) calculations
- Preparation of a structured demand model suitable for DNO submission
Development Overview
The scheme comprised:
- 8 residential units
- Electrified systems including:
- heat pumps
- EV charging provision
Each dwelling demonstrated a diversified load typically in the region of:
- ~20–22 kVA per unit
Key Engineering Findings
The analysis identified:
- Significant reduction in total demand through diversity application
- Realistic modelling of:
- Heat pump operation
- EV charging behaviour
- Overall diversified site demand in the region of:
- ~60–95 kVA depending on diversity assumptions
This formed a robust and defensible basis for the incoming supply requirement.
Engineering Insight
A key element of the project was balancing:
- Individual dwelling electrical demand, and
- Diversified demand across the development
Without applying engineering-led diversity:
- Supply requirements would be overstated
- Infrastructure costs would increase unnecessarily
Accurate ADMD modelling is critical for residential developments incorporating electrified heating and transport.
Outcome
XLR8 MEP Design Ltd delivered a clear and structured electrical demand assessment which:
- Defined the required capacity for the main incoming supply
- Supported the developer’s DNO application
- Enabled informed decision-making at an early project stage
Project Value
This project demonstrates XLR8’s role in supporting residential developments through:
Practical, data-led electrical design that enables projects to move forward efficiently and cost-effectively.
Planning a Similar Development?
If you are developing a residential scheme and need clarity on electrical capacity, heat pump integration, or DNO requirements, XLR8 MEP Design Ltd can provide clear, technically robust support.
Contact us to discuss your project
Get a MEP Design Quote
If you’re planning a self-build or residential development and want expert MEP design support with clear deliverables and commercial-level experience, we would be delighted to help.